Listed below are some of the projects which Pars Saman and its shareholders have carried out in the pars:
Telecom Project Of 4th National Gas Pipeline (IGAT-IV):
This project was performed by Micromodje Industries for NIGEDC(NIGC) and started on 2005. The main equipment used in this project were Fiber Optic Telecom Network, VHF/UHF Radio Communication Systems, Power systems, Hotline Telephone Systems, Telecom Towers. This project also included  Telecom Building Construction and Fiber Optic Cable Laying... [more]
9th Olefin Petrochemical complex PABX System:
The main contractor of this project was Dorriz and it was done for Arya Sasol Petrochemical Complex. This project was awarded to Dorriz on year 2006. The main Equipment used in this project were PABX Telephone System and Power System.
National Dispatching Network Transmission System:
This Project was awarded to Micromodje Industries by NIGC on 2004. The main equipment used in this project were PMP Radio Communication System, Antennas and Accessories.
IKIA Telecom Network:
This Project was awarded to Micromodje Industries by IKIA on year 2000.The main Equipment used in this project were PMP Radio Communication System, Antennas & Accessories, VHF-AM Radio System, PABX Telecom System and Power System.

RAJA Microwave System:
This Project was awarded to Micromodje Industries by Iran Railways (RAJA) on 2002. The main Equipment used in this project were Microwave Radio System, Antennas & Accessories and Network Management System.
Maintenance of South & West BTS Sites of Tehran City:
This Project was awarded to Micromodje Industries by MCCI on 2006.
1200 BTS Sites Operation for GC Expansion Project:
This Project was awarded to Behin Ertebat Mehr (a subsidiary of Micromodje) by MCCI on year 2006 on a turnkey basis.
Procurement of 1323 Links of Analog & Digital Microwave Radios:
We have supplied more than 1323 links of Microwave radios to TCI, TC of provinces, IRIB and …, through 47 contracts from 1991 to 2007. In these contracts, microwave radios had Different Frequency Bands (1.5,2,2.5,8,15,18GHz), Different Capacities (2x2,4x2,8x2, STM0, STM1) and Different Configurations (1+0, 1+1, Space Diversity, Frequency Diversity, …).
Procurement of 7556 sets of Parabolic Grid & GSM Antennas:
We have supplied more than 1323 links of Microwave radios to TCI, TC of provinces, IRIB and …, through 35 contracts from 1991 to 2007. In these contracts, Antennas had Different Frequency Bands (1.5,2,2.5,8,15,18GHz), Different Dimensions (3, 2.4,1.8, 1.2 & 0.6M) and Different Polarization ( V-Pole, X-Pole, …).
Procurement of 2130 sets of TV Transmitters & FM Radio Transmitters:
We have supplied more than 2130 sets of TV Transmitters and FM Radio Transmitters in Different output powers (from 5 Watts to more than 1KW) to Islamic Republic of Iran Broadcasting (IRIB) through 19 contracts from 1991 to 2007.
Procurement of 210 sets of Combiners:
Through 11 contracts from 1991 to 2007 we have supplied more than 210 sets of combiners in different powers to IRIB.
Procurement of 885 sets of Satelite Translators:
Through 17 contracts from 1991 to 2007 we have supplied IRIB with more than 885 sets of four channel Satellite Translators.

 

   
 
   